Terminal Procedures

52B — Moosehead Aero Marine

GREENVILLE, ME · 3 FAA charts · cycle 6 Aug 2026

2 runwaysLongest 6,000 ftNon-toweredVolume NE-1Not for navigation

2 published instrument approaches: 2 RNAV (GPS).

All 3 52B charts in one download Every approach, departure, arrival and minimums page for this airport, sorted into folders, as a single ZIP. Taken one at a time on the free tier, 3 charts is roughly 19 sec of downloading — they queue one behind another.
PRO members only

Instrument approach procedures

ChartAmendment
RNAV (GPS)-B chart previewRNAV (GPS)-B1APDF
RNAV (GPS)-B, CONT.1 chart previewRNAV (GPS)-B, CONT.11APDF

Takeoff and alternate minimums

ChartAmendment
TAKEOFF MINIMUMS chart previewTAKEOFF MINIMUMSPDF

Minimums pages cover a whole volume, so the same document is shared by every airport in it.

52B airport information

Control tower
No
ARTCC
Boston Center
Flight service
Bangor
NOTAM facility
BGR (NOTAM-D available)
Magnetic variation
18W
Bottled oxygen
None
Ownership
Privately owned
Sectional
Montreal
Last FAA inspection
2024-08-15

From the FAA NASR 28-day subscription, cycle 6 Aug 2026.

Runways

6,000 × 1,200 ft14W32W5,000 × 1,000 ft18W36WN1,000 ft
Runway layout at 52B, drawn to scale from FAA published runway-end coordinates and true alignments. Runways served by an ILS are highlighted.
RunwayLengthWidth SurfaceLighting
14W/32W6,000 ft1,200 ftWater
18W/36W5,000 ft1,000 ftWater

Runway and approach-aid data from the FAA NASR 28-day subscription.

FAA remarks for 52B

  • EXISTED PRIOR TO 1959.
  • FOR CD CTC BOSTON ARTCC AT 603-879-6859.
  • DOCK - BRING OWN ROPES TO SECURE ACFT.
  • BE ALERT: NEARBY 21M CURRIER'S SPB (1.1 MI WEST) UTILIZE SAME CTAF 122.9. MNT 3B1 CTAF 122.8 IF ABLE FOR LCL TFC.
  • COLD TEMPERATURE AIRPORT. ALTITUDE CORRECTION REQUIRED AT OR BELOW -21C.

Published verbatim from the FAA NASR subscription. Abbreviations are the FAA's own.

Common questions about 52B

What charts are available for 52B?

3 current FAA charts for Moosehead Aero Marine, including 2 instrument approachs. All are free to download as PDFs from this page, from the 6 August 2026 cycle.

How long is the runway at 52B?

Moosehead Aero Marine has 2 runways. The longest is 14W/32W at 6,000 ft by 1,200 ft, water. Full runway dimensions, lighting and approach aids are listed on this page.

Does 52B have an ILS approach?

No ILS is published. In total 52B has 2 published instrument approaches, of which 2 are RNAV (GPS).

Is 52B a towered airport?

No — Moosehead Aero Marine has no control tower. Traffic co-ordinates on a common frequency rather than with a controller, which is listed in the frequencies table on this page.

Are these 52B charts current?

They are from the FAA cycle effective 6 August 2026, which is superseded on 3 September 2026. We publish each new cycle on its effective date. They are for flight simulation and reference only — not for real-world navigation.

Wider chart sets

Bulk archives are a PRO benefit. Individual charts are free for everyone, always.

Flying into 52B? PRO members take all 3 charts as one ZIP instead of 3 separate downloads, at full line speed with no cap — plus every chart family archive and all 24,000+ add-ons in the library.

Go PRO

Not for navigation. For flight simulation and reference use only. Procedures are superseded on a 28-day cycle — obtain current official charts from the FAA for real-world flight.

FAA public-domain products, mirrored unmodified. Fly Away Simulation is not affiliated with or endorsed by the FAA. Chart licensing and terms.