Terminal Procedures

PPIZ — Point Lay Lrrs

POINT LAY, AK · 2 FAA charts · cycle 6 Aug 2026

FAA PIZElevation 28 ft1 runwayLongest 4,500 ftNon-toweredVolume AK-1Not for navigation

2 published instrument approaches: 2 RNAV (GPS), serving 2 runway ends.

All 2 PPIZ charts in one download Every approach, departure, arrival and minimums page for this airport, sorted into folders, as a single ZIP. Taken one at a time on the free tier, 2 charts is roughly 13 sec of downloading — they queue one behind another.
PRO members only

Instrument approach procedures

ChartAmendment
RNAV (GPS) RWY 06 chart previewRNAV (GPS) RWY 062PDF
RNAV (GPS) RWY 24 chart previewRNAV (GPS) RWY 242APDF

PPIZ airport information

Control tower
No
Attendance
Continuous
ARTCC
Anchorage Center
Flight service
Barrow
NOTAM facility
PIZ (NOTAM-D available)
Magnetic variation
8E
Beacon
White-green (lighted land airport), see remarks
Wind indicator
Lighted
Segmented circle
Yes
Customs
Landing rights airport
Activated
March 1960
Ownership
Publicly owned
Sectional
Cape Lisburne
Last FAA inspection
2025-07-12

From the FAA NASR 28-day subscription, cycle 6 Aug 2026.

PPIZ radio frequencies

ServiceFrequencyCall sign
CTAF122.8

Civil VHF frequencies from the FAA NASR 28-day subscription. Discrete sector and military frequencies are not listed.

Runways

4,500 × 100 ft0624N1,000 ft
Runway layout at PPIZ, drawn to scale from FAA published runway-end coordinates and true alignments. Runways served by an ILS are highlighted.
RunwayLengthWidth SurfaceLighting
06/244,500 ft100 ftGRAVEL GoodMedium intensity
  06 69°TPAPI (4-box) 3°
  24 249°TPAPI (4-box) 3°

Runway and approach-aid data from the FAA NASR 28-day subscription.

Where PPIZ is

Latitude, longitude69.7328890, -163.0053330
Elevation28 ft
From Point Lay1 nm S

Paste the coordinates into a simulator’s world map to drop straight onto the field.

FAA remarks for PPIZ

  • ACTVT ROTG BCN - CTAF.
  • ACTVT REIL RWY 06 & 24; PAPI RWY 06 & 24; MIRL RWY 06/24 - CTAF.
  • WX CAMERA AVBL ON INTERNET AT HTTPS://WEATHERCAMS.FAA.GOV
  • BARROW FSS - 1-800-779-7709 OR 907-852-2511.
  • COLD TEMPERATURE AIRPORT. ALTITUDE CORRECTION REQUIRED AT OR BELOW -33C.

Published verbatim from the FAA NASR subscription. Abbreviations are the FAA's own.

VFR charts covering PPIZ

Common questions about PPIZ

What charts are available for PPIZ?

2 current FAA charts for Point Lay Lrrs, including 2 instrument approachs. All are free to download as PDFs from this page, from the 6 August 2026 cycle.

What are the radio frequencies for PPIZ?

CTAF 122.8. Full civil VHF list, with sector notes, is in the frequencies table on this page — from the FAA NASR subscription.

How long is the runway at PPIZ?

Point Lay Lrrs has 1 runway. The longest is 06/24 at 4,500 ft by 100 ft, gravel. Full runway dimensions, lighting and approach aids are listed on this page.

Does PPIZ have an ILS approach?

No ILS is published. In total PPIZ has 2 published instrument approaches, of which 2 are RNAV (GPS).

Is PPIZ a towered airport?

No — Point Lay Lrrs has no control tower. Traffic co-ordinates on a common frequency rather than with a controller, which is listed in the frequencies table on this page.

Are these PPIZ charts current?

They are from the FAA cycle effective 6 August 2026, which is superseded on 3 September 2026. We publish each new cycle on its effective date. They are for flight simulation and reference only — not for real-world navigation.

Wider chart sets

Bulk archives are a PRO benefit. Individual charts are free for everyone, always.

Flying into PPIZ? PRO members take all 2 charts as one ZIP instead of 2 separate downloads, at full line speed with no cap — plus every chart family archive and all 24,000+ add-ons in the library.

Go PRO

Not for navigation. For flight simulation and reference use only. Procedures are superseded on a 28-day cycle — obtain current official charts from the FAA for real-world flight.

FAA public-domain products, mirrored unmodified. Fly Away Simulation is not affiliated with or endorsed by the FAA. Chart licensing and terms.